← All Fire Protection projects

CIG Fire Protection / Package spotlight

Bayards Court, Dartmouth

Dartmouth, Devon

Door-installation package

183 doors through a new 63-bedroom care home in Dartmouth, every fire door stopped, certified and recorded.

See our scope
Bayards Court care home in Dartmouth from the road: three storeys of stone, render and slate with glazed balconies
Bayards Court from the road

A 63-bedroom care home in the South Hams, opened after a two-year build.

Our work

Bayards Court.
183 doors, three floors.

CIG installed 183 doors through Bayards Court, a new three-storey, 63-bedroom care home in Dartmouth, across the bedroom floors and stairwells, working for the main contractor as part of the wider carpentry package.

The schedule ran from FD30 and FD60 leaf-and-a-half doorsets with Pyrobelite glazing on the corridors and stairs to single-leaf bedroom doors, glazed double doors with side screens to the lounges and dining rooms, and pocket and wardrobe doors. Each fire door was fire-stopped at the frame and certified under the BM TRADA scheme with its own record.

Location
Dartmouth, Devon
Sector
Care homes
Package size
183 doors
Ratings
FD30 and FD60
Scheme
BM TRADA

CIG Fire Protection / Scope

The package.
Clearly defined.

  • 183 doors across three floors and three stairwells
  • FD30 and FD60 leaf-and-a-half doorsets with Pyrobelite glazing
  • Single-leaf bedroom doors with ironmongery to the schedule
  • Glazed double doors with side screens to the communal rooms
  • Fire stopping and BM TRADA certification recorded for every fire door

Planning something similar?

Discuss your fire-door package.

Share your scope, site location and target dates with the Fire Protection team.

Discuss a similar package