The work and the detail.
CIG undertakes specified cavity-barrier installation within new-build, refurbishment and remedial packages. We start with the cavity locations, construction details and product information, and agree the access and checks before the work is concealed.
The work we cover
- Specified cavity-barrier installation
- New-build and refurbishment packages
- Defined remedial cavity-barrier works
- Location and installation photographs before closure
Plan the hidden work early.
Cavity-barrier works are coordinated with the surrounding construction and the sequence for closing up. The agreed records capture the installed locations and details while they remain accessible.
Questions about this package
Can you review a specified cavity-barrier package?
Send the schedule, details, product information and target dates. We can review the proposed installation scope and identify the information needed before works are agreed.
Can existing cavities form part of the package?
Include the existing report and explain which areas are accessible. Any opening-up, reinstatement or further investigation needs to be agreed as part of the project scope.
Documented from installation to handover.
We agree the records for the package before work begins, including location references, photographs and the applicable installation or maintenance documentation.
Our delivery approachWhere we work
Fire stopping, fire doors and remedial works across the South West, South Wales and the M4 corridor, including Reading, Oxford, Southampton and London.
