CIG Fire Protection / Projects

Fire protection.
In practice.

Fire-door and fire-stopping packages. Explore our work and the scope behind each installation.

7 projects
Bayards Court care home in Dartmouth from the road: three storeys of stone, render and slate with glazed balconies
Door-installation package
Care homes / Dartmouth, Devon

Bayards Court, Dartmouth

183 doors through a new 63-bedroom care home in Dartmouth, every fire door stopped, certified and recorded.

183-door package / Care homesView the package
Timber-lined corridor and meeting-room frontage
Fire doors & fire stopping
Workplace / Bristol

Workplace fire protection

Fire-door and fire-stopping packages for a Bristol workplace.

Fire doors / Fire stoppingView the package
Pipe collar seal around a white plastic pipe through a wall, with a red CIG QR-coded label beside it
Fire stopping & fire doors
Hospitality / Cheltenham

Wine bar fit-out, Cheltenham

Fire stopping and Q-Mark fire doors for a wine bar fit-out, every seal labelled and recorded.

Fire stopping / Fire doorsView the package
Bath-stone student accommodation block seen from the street on a sunny day
Fire doors & passive fire protection
Student accommodation / Avon Street, Bath

John Wood Court, Bath

343 fire doorsets and more than 2,900 recorded fire-stopping installations through six blocks of student rooms, floor by floor.

Fire doors / Fire stoppingView the package
Aerial view of the Aviva Lake View office campus at Stoke Gifford, Bristol, with its curved roofs, lake and parkland
Fire doors & passive fire protection
Workplace / Stoke Gifford, Bristol

Aviva Lake View, Bristol

Eighteen Q-Mark fire doorsets and passive fire protection across Modules 5 and 6 of the Lake View campus, with acoustic performance specified alongside the fire rating.

Fire doors / Fire stoppingView the package
One Castle Park, a red-brick eight-storey office building beside Castle Park in Bristol, seen from the street corner
Fire doors & passive fire protection
Workplace / Tower Hill, Bristol

One Castle Park, Bristol

Fire doors, acoustic doors and fire-rated service walls for a refurbished floor in a city-centre office building.

Fire doors / Fire stoppingView the package
The Castle School, Taunton: four-storey brick main building with the single-storey main entrance in front
Fire stopping & compartmentation
Education / Wellington Road, Taunton

The Castle School, Taunton

Fire-stopping, compartmentation and fire-door remedials across six blocks of a Taunton secondary school, delivered over the summer holiday.

Fire stopping / Fire doorsView the package

Start a conversation

Send the schedule.
Start the conversation.

Bring us the brief, the location and the programme. Start a conversation with the right CIG team.

Discuss your project