CIG Fire Protection / Package spotlight
One Castle Park, Bristol
Tower Hill, Bristol
Fire doors & passive fire protection
Fire doors, acoustic doors and fire-rated service walls for a refurbished floor in a city-centre office building.
See our scope
Eight floors of refurbished offices beside Castle Park. CIG Fire Protection worked on the first floor.
Our work
One Castle Park.
Fire and acoustics together.
CIG Fire Protection installed the doorsets and passive fire protection for the refurbishment of the first floor at One Castle Park, the eight-storey office building beside Castle Park in Bristol now marketed as BLOK, working for the main contractor over three months.
Four acoustic doorsets with vision panels were specified at 40 dB alongside an FD30 fire door, so seals, closers and locks were selected to meet both requirements. Service walls and bulkheads were built in fireboard with Rockwool batt seals to the penetrations, and the compartment lines were closed as the fit-out progressed.
- Location
- Tower Hill, Bristol
- Sector
- Workplace
- Packages
- Fire and acoustic doors / Fire stopping
- Programme
- July 2026, 3 months
- Scheme
- BM TRADA Q-Mark
CIG Fire Protection / Scope
The package.
Clearly defined.
- Five doorsets to the refurbished floor: four 40 dB acoustic doors with vision panels and an FD30 fire door
- Fire-rated service walls and bulkheads in fireboard
- Rockwool batt and fire-stopping seals to the penetrations
- Compartment lines sealed as the fit-out progressed
- Installation under the BM TRADA Q-Mark scheme
Planning something similar?
Discuss your fire protection package.
Share your scope, site location and target dates with the Fire Protection team.
Discuss a similar package
